The recently delivered CO2 pump was installed and connected to the CEEGS test facility at the Helmholtz-Zentrum Dresden Rossendorf (HZDR). Subsequently, pressure and leakage tests were performed to ensure the safe and stable operation of the pump.
Once the electrical installation of the component is completed, the first high-pressure experiments can be carried out.
Stay tuned for more updates from the CEEGS facility!